Salzgitter - A new concrete mixing plant and a truck mixer were put into operation by SCHACHTBAU NORDHAUSEN GmbH in the Konrad shaft. The wet spraying method will be used for the installation of the future inner lining of the disused iron ore mine. The new mixing plant will supply the required concrete. The transport in the mine's extensive roadway system is ensured by the truck mixer.