WWTP Cloppenburg


Expansion of WWTP / 2. BA

Key services:

• Dismantling of old compresser unit and provion with new compressor (Turbo)
• Dismantling of old sludge thickeing unit and installtion of new unit
• Biologic Cascade Equipping with fine bubble ventilation (Manuf. Supratec), Equipping of secondary sedimentation tanks
• Restoration of trickling filter
• Renovation and re-equipment of pumping stations for recirculated return sludge-excess sludge, reconstruction and new construction Distribution- and MIF (magnetic-inductive flowmeter)
• Reconstruction of reserviour basins incl. Stirring units
• Reconstruction and new construction of various pumping stations of the entire plant
• Pipeline construction in stainless steel from DN 25 to DN 900

Construction time: February 2018 – July 2019