Key services:
• Dismantling of old compresser unit and provion with new compressor (Turbo)
• Dismantling of old sludge thickeing unit and installtion of new unit
• Biologic Cascade Equipping with fine bubble ventilation (Manuf. Supratec), Equipping of secondary sedimentation tanks
• Restoration of trickling filter
• Renovation and re-equipment of pumping stations for recirculated return sludge-excess sludge, reconstruction and new construction Distribution- and MIF (magnetic-inductive flowmeter)
• Reconstruction of reserviour basins incl. Stirring units
• Reconstruction and new construction of various pumping stations of the entire plant
• Pipeline construction in stainless steel from DN 25 to DN 900
Construction time: February 2018 – July 2019
SCHACHTBAU NORDHAUSEN GmbH
Industrieweg 2a
99734 Nordhausen
Telephone: +49 3631 632-0
Fax: +49 3631 632-334
E-Mail: sbn@schachtbau.de
Web: www.schachtbau.de
Copyright © , All Rights Reserved